Changes one data point, re-validates the study against the schema and, by
default, marks the data point as verified with a note listing the changes
(e.g. "value1: 5.1 -> 5.2"). Use this (or review_values()) rather than
editing data.csv by hand, so corrections are documented.
Usage
update_data_point(
path = ".",
study_id,
measurement_id,
...,
verify = TRUE,
reviewer = NULL,
note = NULL
)Arguments
- path
Project root.
- study_id
Study identifier.
- measurement_id
The data point to change.
- ...
Named new values, e.g.
value1 = 5.2, unit = "pg/mL".- verify
Mark the corrected data point as verified? Defaults to
TRUE.- reviewer, note
See
set_verification().noteis appended to the list of changes.